lol电竞平台官网

In a life threatening emergency dial Triple Zero (000)

In a life threatening emergency dial Triple Zero (000)
ACT Public Hospitals

Canberra Hospital

5124 0000


Calvary Hospital

6201 6111

Mental Health

Call Mental Health Triage on

1800 629 354

(free call except from mobiles or public phones) or

6205 1065

Poisons Hotline

For a poison emergency in Australia call

131126

Drug and Alcohol Help Line

The Drug and Alcohol Help Line is available 24-hours, 7 days a week on

5124 9977

Health Protection Service

For after hours urgent public health matters including environmental health, radiation safety, food poisoning and communicable disease management phone:

(02) 6205 1700

healthdirect

24 hour health advice

1800 022 222

ACT State Emergency Service

Emergency help
during flood or storms

132 500

Soft landscape consolidation


Every development that is required to obtain a certificate of Soft Landscape Consolidation Commencement needs to meet the following criteria.

Document requirements

When lodging a Landscape Consolidation submission please note the following important requirements:

Lodgement of Landscape Consolidation

All post DA submissions must be lodged via the ProjectWise Portal as per the process (PDF 252KB).

Assessment process

  1. Applicant inspects site and certifies work is acceptable for Soft Landscape Consolidation Commencement in accordance with TCCS requirements.
  2. Applicant lodges the submission as per above document requirements.
    Submissions from individual consultants for separate elements of work for the same project and in the same location must be presented together.
  3. TCCS undertakes a content check to ensure the minimum requirements for lodgment of a Soft Landscape Consolidation Commencement submission have been met. A response acknowledging receipt will be issued the day after the submission is received.
    Incomplete submissions and those which do not meet all the requirements are returned to the applicant for completion.
  4. If the Soft Landscape Consolidation Commencement submission has met all the requirements, an inspection is arranged to assess works.
  5. If works are satisfactorily completed, TCCS will issue the certificate of Soft Landscape Consolidation Commencement.

Fees and Charges

Fees and charges may apply for repeat applications, submissions and inspections of works. Please refer to the Submissions and Inspections Guideline Principles and Related Fees and Charges for TCCS and Industry (PDF 133KB).